ScorpscopeFree estimate check
  1. Guides
  2. Xactimate
  3. Reading an estimate

How to read an Xactimate® estimate

Checked November 2026

Short answer

An Xactimate estimate report is assembled from sections: a coversheet with the estimate type, key dates, the price list used and the estimator; line items grouped by room or area with their cost totals; summaries and recaps of costs by room and by category; breakdowns of add-ons and taxes; and the Sketch pages, usually at the end.

The person who prints an estimate chooses which sections go into the report, so two reports of the same estimate can look different. These are the sections you will meet most often.

Coversheet

The first page identifies the estimate: its type, key dates, the price list it was written with, and the estimator and company. Opening and closing statements may follow.

Line items

Line items are organized by grouping: the estimator picks a room or area — in the grouping list or by clicking it in the sketch — and adds items to it. Each item carries a description, a quantity and a price, and each group ends with its cost totals. Reading an estimate group by group shows where on the building each cost sits.

Summaries and recaps

After the line items come the summaries: totals for the estimate, and recaps of line item costs by room and by category, each showing its share of the total. Those shares leave out sales tax and overhead and profit, which appear in their own breakdown of add-ons and taxes. Some reports also include audit trails.

Notes

Notes come in two kinds. External notes print on the reports where they apply. Internal notes can be kept off customer-facing reports, but they stay in the project data when the project is sent on.

Sketch pages

Most reports attach the sketch at the end: the drawn plan of rooms, walls and roof planes that the quantities come from. See Sketch basics.

The price list

Prices come from the price list named on the coversheet. Price lists are specific to an area and a month, and some values, such as sales tax rates, are applied by ZIP code. See Price lists.

Sources

  1. Xactware (Verisk) help center, What information is in Estimate reports?. Accessed November 2026.
  2. Xactware (Verisk) help center, Add a line item in Xactimate desktop (X1). Accessed November 2026.
  3. Xactware (Verisk) help center, What is the difference between internal and external notes and how are they handled?. Accessed November 2026.
  4. Xactware (Verisk) help center, What are the differences in price lists, both in area and by month?. Accessed November 2026.

For contractors: need the whole repair documented? Send one estimate for a free check.

Free estimate check