- Home
- What we document
- Roofing
Roofing
Short answer
A pitched roof is a layered system: deck, underlayment, edge metal, starter course, the roof covering, valleys, flashing, hip and ridge caps, and attic ventilation, installed to the covering manufacturer's instructions. On roofing we document roof systems — covering, underlayment and edge metal, ridge and ventilation, flashing and penetrations — with code-required items for the repair, items that must be detached and reset, and project costs.
For roofing and exterior contractors.
Free estimate checkA pitched roof is built in layers, each with its own job. The descriptions below follow the installation instructions and trade-association guidance listed under Sources.
How a steep-slope roof is built



- DeckPlywood or OSB panels — on older houses, board planks — fastened to the rafters or trusses. Panels are laid with a small gap so they can expand, and the deck is clean and dry before roofing starts.
- UnderlaymentThe layer between the deck and the roof covering, a secondary barrier against water. The main types are asphalt-saturated felt, glass-fiber felt, synthetic sheets and self-adhering membranes.
- Eave protectionA self-adhering membrane laid along the lower edge of the roof.
- Drip edgeCorrosion-resistant metal at the eaves and rakes, with an outward kick that throws water clear of the fascia. At the eaves it usually goes under the underlayment; at the rakes, over it.
- Starter courseStarter strips along the eaves and rakes give the roof edges a sealed first course.
- Field shinglesCourses run from the eaves up, each lapping the one below, fastened with corrosion-resistant roofing nails.
- ValleysWhere two slopes meet in an inside corner, the valley is laid over a leak-barrier membrane and built one of three ways: open, with metal lining the valley; closed-cut, with one side's shingles running through and the other side trimmed back; or woven, with the courses interlaced.
- FlashingAt a sidewall, step flashing — one bent metal piece per shingle course — is covered by counterflashing or the wall cladding. A chimney gets an apron at the front, step flashing at the sides and counterflashing set into the mortar joints, and a cricket — a small peaked diverter — can sit behind it to turn water around it. Plumbing vents get a pipe flashing sealed to the deck.
- Hip and ridgeCap shingles finish the hips and ridges.
- Attic ventilationIntake vents low on the roof, in the soffit or at the roof edge, pair with exhaust vents at or near the peak — ridge, box, turbine, off-ridge or gable vents. Air moving through the attic carries off heat and moisture.
Other roof coverings

Standing-seam metal. Panels held by concealed clips that let them expand and contract with temperature, each fixed at one end and joined to the next with a folded seam.

Wood. Shakes have at least one split face; shingles are sawn. Shake courses are interlaid with strips of felt; wood shingles are not.

Slate. Natural slate laid with a headlap over the course below and fastened with copper nails.

Clay and concrete tile. Laid over underlayment, on battens or directly on the deck, and secured with nails or screws, adhesive foam or mortar, depending on the system.

Low-slope roofs. Built-up roofing of reinforcing plies set in hot asphalt; modified bitumen sheets; single-ply membranes such as EPDM, PVC and TPO; and sprayed polyurethane foam under a protective coating.
What we document here
- Roof systems — covering, underlayment and edge metal, ridge and ventilation, flashing and penetrations
- Code-required items for the repair
- Items that must be detached and reset
- Project costs — overhead and profit, permits, disposal
Your package comes as an Xactimate® estimate.
We document only what is really there: every item traces to the property's documented condition and to a stated, checkable basis.
See every category we document and the sample package.
Our standard terms
Easy to start. Easy to leave.
- Pay after the job startsWe wait for your job: each invoice is due 15 days after work starts (or after the invoice, if later) and never later than 90 days after the invoice.
- Nothing upfrontNo deposit, no setup fee, no monthly fee. Homeowners never pay us.
- No exclusivity, no minimumsWork with anyone you like on other jobs. Send us only the files you choose, as many or as few as you like.
- Lose the job, owe nothingIf another contractor gets the job before work starts, and neither you nor a related business does the work, you owe us nothing on that file.
- Change your mind for freeClose a file's work order by email before we send you the first package, and you owe nothing on it.
- Fast, free estimate checksOne before you sign. After you sign, every insurer estimate you send us gets one.
- Leave any timeEnd the agreement by email, with no penalty. Work orders already open run to the end.
- Your customer stays yoursYou stay the contractor of record and your customer's contact.
Questions
Who pays you?
Nothing upfront. You — the contractor — pay us, on terms set out in your agreement. Homeowners never pay us.
When do we pay?
After the job starts. Each invoice is due 15 days after work starts (or after the invoice, if later) and never later than 90 days after the invoice, unless you lose the job to another contractor before work starts. Just email us the day work starts: materials delivered or tear-off begun.
What if we lose the job?
You owe us nothing on that file if another contractor gets the job before work starts and neither you nor a related business does the work. Just let us know and send us written confirmation.
What do we sign?
One master agreement, then a short work order for each file, signed electronically.
What format does the package come in?
Your package comes as an Xactimate® estimate.
Sources
Checked November 2026.
- GAF, Steep-Slope Pro Field Guide (Version 2.1). Accessed November 2026.
- Asphalt Roofing Manufacturers Association (ARMA), Steep Slope Roofing Underlayment (Technical Bulletin, May 2025). Accessed November 2026.
- Asphalt Roofing Manufacturers Association (ARMA), Protecting Against Damage from Ice Dams (Technical Bulletin, revised March 2019). Accessed November 2026.
- Asphalt Roofing Manufacturers Association (ARMA), Installation of Drip Edge at Eaves and Rakes (May 6, 2025). Accessed November 2026.
- Asphalt Roofing Manufacturers Association (ARMA), Attic Space Ventilation in Steep Slope Asphalt Roof Systems (White Paper, 9.03.2025). Accessed November 2026.
- Cedar Shake and Shingle Bureau (CSSB), New Roof Construction Manual (2020 Edition). Accessed November 2026.
- U.S. General Services Administration (GSA), Specifications for Slate Shingles (Historic Preservation Technical Procedures). Accessed November 2026.
- Florida Roofing and Sheet Metal Contractors Association (FRSA) and Tile Roofing Industry Alliance (TRI), Florida High Wind Concrete and Clay Tile Installation Manual, 6th Edition (effective Dec. 31, 2020). Accessed November 2026.
- Fabral, Stand'N Seam Roofing System Installation Manual. Accessed November 2026.
- National Park Service, Roofing Today (roofing exhibit, Technical Preservation Services). Accessed November 2026.