Siding
Short answer
An exterior wall is built in layers: sheathing, a water-resistive barrier, flashing at openings, the siding and its trim, each installed to its manufacturer's instructions. On siding we document exterior walls — siding, trim, soffit and fascia — with code-required items for the repair, items that must be detached and reset, and project costs.
For roofing and exterior contractors.
Free estimate checkAn exterior wall is built in layers, and the siding is only the outermost one. The descriptions below follow the installation instructions and guidance listed under Sources.
How an exterior wall is built



- Framing and sheathingStuds, usually covered with structural sheathing such as OSB, carry the siding.
- Water-resistive barrierSiding is a cladding, not the water barrier. A continuous barrier behind it — housewrap or building paper — keeps liquid water out of the wall, while the space behind the siding lets the wall drain and dry.
- Flashing at openingsWindows and doors are flashed shingle-fashion, so each upper layer laps over the one below: the sill pan first, jamb flashing over the pan, head flashing over the jambs, and the barrier laid back down over the head flashing.
- Kick-out flashingA diverter at the foot of a roof-to-wall joint that steers water into the gutter instead of down the wall.
- TrimA starter at the base, corner posts and channels around openings finish the edges of the siding.
Siding materials
- VinylPanels lock into the course below and hang on nails set in slotted hems, loose enough for each panel to move with temperature. A starter strip locks the first course, corner posts finish the corners, J-channel receives the cut ends around windows and doors, and utility trim holds a panel cut under a window.
- Fiber cementLap planks are usually blind-nailed near the top edge, where the next course covers the nails.
- Engineered woodLap siding blind-nailed below the top edge, with small gaps at butt joints and trim.
- WoodCedar and other wood siding fastened with corrosion-resistant nails, each board nailed on its own. Furring strips can hold the siding off the sheathing to form a drainage gap.
- SteelSteel lap siding, hung to float like vinyl.
What we document here
- Exterior walls — siding, trim, soffit and fascia
- Code-required items for the repair
- Items that must be detached and reset
- Project costs — overhead and profit, permits, disposal
Your package comes as an Xactimate® estimate.
We document only what is really there: every item traces to the property's documented condition and to a stated, checkable basis.
See every category we document and the sample package.
Our standard terms
Easy to start. Easy to leave.
- Pay after the job startsWe wait for your job: each invoice is due 15 days after work starts (or after the invoice, if later) and never later than 90 days after the invoice.
- Nothing upfrontNo deposit, no setup fee, no monthly fee. Homeowners never pay us.
- No exclusivity, no minimumsWork with anyone you like on other jobs. Send us only the files you choose, as many or as few as you like.
- Lose the job, owe nothingIf another contractor gets the job before work starts, and neither you nor a related business does the work, you owe us nothing on that file.
- Change your mind for freeClose a file's work order by email before we send you the first package, and you owe nothing on it.
- Fast, free estimate checksOne before you sign. After you sign, every insurer estimate you send us gets one.
- Leave any timeEnd the agreement by email, with no penalty. Work orders already open run to the end.
- Your customer stays yoursYou stay the contractor of record and your customer's contact.
Questions
Who pays you?
Nothing upfront. You — the contractor — pay us, on terms set out in your agreement. Homeowners never pay us.
When do we pay?
After the job starts. Each invoice is due 15 days after work starts (or after the invoice, if later) and never later than 90 days after the invoice, unless you lose the job to another contractor before work starts. Just email us the day work starts: materials delivered or tear-off begun.
What if we lose the job?
You owe us nothing on that file if another contractor gets the job before work starts and neither you nor a related business does the work. Just let us know and send us written confirmation.
What do we sign?
One master agreement, then a short work order for each file, signed electronically.
What format does the package come in?
Your package comes as an Xactimate® estimate.
Sources
Checked November 2026.
- Vinyl Siding Institute, Inc., Vinyl Siding Installation Manual. Accessed November 2026.
- James Hardie Building Products, HardiePlank Lap Siding installation instructions (copy on file with the Florida Building Commission). Accessed November 2026.
- Louisiana-Pacific Corporation (LP), LP SmartSide ExpertFinish 38 Series Lap Joint Siding: Application Instructions (April 2024). Accessed November 2026.
- Real Cedar (Western Red Cedar Lumber Association), Western Red Cedar Siding Pre-Installation Tips. Accessed November 2026.
- EDCO Products, Inc., Siding: Installation Guide (Steel-Kore steel siding, September 2022). Accessed November 2026.
- Building America Solution Center, U.S. Department of Energy (Pacific Northwest National Laboratory), Windows and Doors are Fully Flashed. Accessed November 2026.