ScorpscopeFree estimate check
  1. Home
  2. What we document
  3. Gutters

Gutters

Short answer

A gutter system collects water at the eaves and carries it to the ground: gutter runs on hangers, end caps, outlets, downspouts, elbows and extensions. We document gutters and downspouts, with items that must be detached and reset, and project costs.

For roofing and exterior contractors.

Free estimate check

The descriptions below follow the installation instructions and guidance listed under Sources.

How a gutter system is built

White gutter and downspout on a house with lap siding
K-style gutter; elbows carry the downspout back to the wall
Half-round gutter with a drop outlet in front of a gable
Half-round gutter with a drop outlet
Gutter and downspout at the corner of a brick house
Gutter along the eave, downspout at the corner
  • PurposeGutters and downspouts collect roof runoff and carry it away from the foundation, so the soil around the house does not saturate.
  • Profiles and sizesThe two main profiles are K-style, also called ogee, and half-round. Residential gutters commonly come in 4-, 5- and 6-inch sizes.
  • MaterialsVinyl, aluminum, galvanized steel and copper. Copper and galvanized steel resist dents from ladders and branches better than vinyl or aluminum.
  • PartsA sectional system is built from gutter lengths joined end to end, end caps, inside and outside miters at the corners, and drop outlets. The gutter hangs from the fascia on spikes and ferrules, brackets or hidden hangers.
  • SlopeGutters slope slightly toward the downspouts.
  • DownspoutsRound or rectangular, plain or corrugated, connected to the gutter through an outlet and strapped to the wall. Elbows turn them toward or away from the wall or offset them sideways, and the last elbow sends water out away from the foundation, onto a splash block or into a drain.

How gutters are sized

Gutter and downspout size depends on the design rainfall intensity for the location, the roof area draining to the gutter — adjusted for roof pitch — the gutter's length and shape, and the size and spacing of the outlets. Design rainfall intensities come from NOAA precipitation-frequency estimates for the location.

What we document here

  • Gutters and downspouts
  • Items that must be detached and reset
  • Project costs — overhead and profit, permits, disposal

Your package comes as an Xactimate® estimate.

We document only what is really there: every item traces to the property's documented condition and to a stated, checkable basis.

See every category we document and the sample package.

Our standard terms

Easy to start. Easy to leave.

  • Pay after the job startsWe wait for your job: each invoice is due 15 days after work starts (or after the invoice, if later) and never later than 90 days after the invoice.
  • Nothing upfrontNo deposit, no setup fee, no monthly fee. Homeowners never pay us.
  • No exclusivity, no minimumsWork with anyone you like on other jobs. Send us only the files you choose, as many or as few as you like.
  • Lose the job, owe nothingIf another contractor gets the job before work starts, and neither you nor a related business does the work, you owe us nothing on that file.
  • Change your mind for freeClose a file's work order by email before we send you the first package, and you owe nothing on it.
  • Fast, free estimate checksOne before you sign. After you sign, every insurer estimate you send us gets one.
  • Leave any timeEnd the agreement by email, with no penalty. Work orders already open run to the end.
  • Your customer stays yoursYou stay the contractor of record and your customer's contact.

Questions

Who pays you?

Nothing upfront. You — the contractor — pay us, on terms set out in your agreement. Homeowners never pay us.

When do we pay?

After the job starts. Each invoice is due 15 days after work starts (or after the invoice, if later) and never later than 90 days after the invoice, unless you lose the job to another contractor before work starts. Just email us the day work starts: materials delivered or tear-off begun.

What if we lose the job?

You owe us nothing on that file if another contractor gets the job before work starts and neither you nor a related business does the work. Just let us know and send us written confirmation.

What do we sign?

One master agreement, then a short work order for each file, signed electronically.

What format does the package come in?

Your package comes as an Xactimate® estimate.

Sources

Checked November 2026.

  1. U.S. Department of Energy, Building America Solution Center (Pacific Northwest National Laboratory), Gutters and Downspouts (Building America Solution Center, last updated 2021-09-26). Accessed November 2026.
  2. Copper Development Association, 10.1 Hung Gutters and Downspouts Basics (Copper in Architecture Design Handbook). Accessed November 2026.
  3. Copper Development Association, Downspouts (Copper in Architecture Design Handbook, section 10). Accessed November 2026.
  4. Amerimax Home Products (OmniMax International), Installing Metal Gutter Systems (instruction sheet). Accessed November 2026.
  5. NOAA National Weather Service, Hydrometeorological Design Studies Center, 5. Precipitation Frequency Data Server (NOAA Atlas 14 documentation). Accessed November 2026.