Detached structures
Short answer
Detached garages and sheds are usually wood-framed, with the same roof and wall systems as a house; fences are wood, vinyl or metal on posts. We document detached structures — garages, sheds, fences — with their roof systems, exterior walls, gutters and downspouts, items that must be detached and reset, and project costs.
For roofing and exterior contractors.
Free estimate checkThe descriptions below follow the guidance and installation instructions listed under Sources.
Garages and sheds


- Wood framingMost are framed like a house: studs on a regular spacing, roof framing tied to the walls, and walls anchored to the foundation, so loads follow a continuous path to the ground.
- Post-frameMany garages, barns and storage buildings are post-frame instead: widely spaced posts carry the building, set in the ground or anchored to a slab, with trusses or purlins in place of rafters.
- Roofs and wallsThe same roof and wall systems as a house, or exposed-fastener metal panels screwed through the flat beside the ribs with sealing washers.
Fences


- WoodPosts, rails and infill boards. Posts in ground contact are pressure-treated to a heavier use category than the boards above ground.
- Chain linkGalvanized wire fabric stretched on a pipe framework, with heavier end, corner and gate posts and a top rail.
What we document here
- Detached structures — garages, sheds, fences
- Roof systems — covering, underlayment and edge metal, ridge and ventilation, flashing and penetrations
- Exterior walls — siding, trim, soffit and fascia
- Gutters and downspouts
- Items that must be detached and reset
- Project costs — overhead and profit, permits, disposal
Your package comes as an Xactimate® estimate.
We document only what is really there: every item traces to the property's documented condition and to a stated, checkable basis.
See every category we document and the sample package.
Our standard terms
Easy to start. Easy to leave.
- Pay after the job startsWe wait for your job: each invoice is due 15 days after work starts (or after the invoice, if later) and never later than 90 days after the invoice.
- Nothing upfrontNo deposit, no setup fee, no monthly fee. Homeowners never pay us.
- No exclusivity, no minimumsWork with anyone you like on other jobs. Send us only the files you choose, as many or as few as you like.
- Lose the job, owe nothingIf another contractor gets the job before work starts, and neither you nor a related business does the work, you owe us nothing on that file.
- Change your mind for freeClose a file's work order by email before we send you the first package, and you owe nothing on it.
- Fast, free estimate checksOne before you sign. After you sign, every insurer estimate you send us gets one.
- Leave any timeEnd the agreement by email, with no penalty. Work orders already open run to the end.
- Your customer stays yoursYou stay the contractor of record and your customer's contact.
Questions
Who pays you?
Nothing upfront. You — the contractor — pay us, on terms set out in your agreement. Homeowners never pay us.
When do we pay?
After the job starts. Each invoice is due 15 days after work starts (or after the invoice, if later) and never later than 90 days after the invoice, unless you lose the job to another contractor before work starts. Just email us the day work starts: materials delivered or tear-off begun.
What if we lose the job?
You owe us nothing on that file if another contractor gets the job before work starts and neither you nor a related business does the work. Just let us know and send us written confirmation.
What do we sign?
One master agreement, then a short work order for each file, signed electronically.
What format does the package come in?
Your package comes as an Xactimate® estimate.
Sources
Checked November 2026.
- U.S. Department of Energy, Building America Solution Center (Pacific Northwest National Laboratory), Advanced Framing Overview (Building America Solution Center). Accessed November 2026.
- U.S. Department of Energy, Building America Solution Center (Pacific Northwest National Laboratory), Continuous Load Path Provided with Connections from the Roof through the Wall to the Foundation (Building America Solution Center, last updated 2022-12-06). Accessed November 2026.
- Southern Forest Products Association (southernpine.com), Post-Frame Construction. Accessed November 2026.
- American Wood Protection Association (AWPA), AWPA Standard U1-25, Use Category System: User Specification for Treated Wood (excerpt). Accessed November 2026.
- Real Cedar (Western Red Cedar Lumber Association), Cedar Fence Construction. Accessed November 2026.
- Whole Building Design Guide (National Institute of Building Sciences), for USACE, NAVFAC and AFCEC, UFGS 32 31 13, Chain Link Fences and Gates (November 2021). Accessed November 2026.
- Fabral, Storage and Installation Instructions for Aluminum and Galvanized Steel Metal Roofing and Siding (November 2023). Accessed November 2026.